Home Products Curshing And Screening Automatic System
Curshing And Screening Automatic System

Curshing And Screening Automatic System

Curshing and screening automatic system uses PLC controlling system to detect the material level and rate of work. 【Processing capacity】: - 【Scope of application】: Judging the load of crusher and optimizing feeding amount. Adjusting the speed to the mine makes the crusher run at near full load.

Advantages

The key signals of all equipment in the process are fully covered, so that real-time monitoring "no dead ends";

Chain protection, equipment monitoring and protection, timely early warning, accurate location of fault points;

The bell will give an early warning before starting the car, and the system will automatically determine whether the starting conditions are met to ensure safe operation and production;

A variety of operation modes: local/remote manual/remote automatic, to meet a variety of usage needs;

The selection of instruments and PLCs meets the requirements of dust environment, and is stable and reliable.

Working Principle

Realize that the post is unattended, focus on inspection, improve the working environment and improve the safety of personnel;

Remote operation is fast/convenient/reliable, which improves production efficiency compared to traditional manual labor;

Real-time monitoring and early warning of equipment operation status to reduce equipment failure rate;

It has a high degree of intelligence and informatization, and provides a variety of equipment and production reports.

Technical Parameters

If you want to know the product price, feed particle size, production capacity, size, etc., please contact us online service.

Success Cases

2psuishaifenzdhxt1.jpg

Zhongnan Diamond Co., Ltd. 4,000 tons/year, with an annual processing capacity of 4,000 tons. Automatic production operation, through the centralized control room, the relevant parameters and equipment operation of the entire processing plant can be mastered, and the key equipment is equipped with a video monitoring system. The centralized control room is equipped with 2 people per shift, three shifts a day, unattended on site, and patrol workers are deployed to conduct regular patrol inspections on the operation of on-site equipment.

Leave Your Need